Any thoughts on 240/120v > 3-wire vs. 4-wire to transfer switch from meter can to SE rated transfer switch.
Bonding jumper is utilized between neutral and ground bus in transfer switch.
Main panel becomes a sub- panel whereas ground bus and neutral bus are isolated.
Some say install equipment bond between transfer switch and meter can and some don't...what are your thoughts on parallel path created with this scenario.
Bonding jumper is utilized between neutral and ground bus in transfer switch.
Main panel becomes a sub- panel whereas ground bus and neutral bus are isolated.
Some say install equipment bond between transfer switch and meter can and some don't...what are your thoughts on parallel path created with this scenario.