Hospital Isolation Panels
Hospital Isolation Panels
It depends is your O.R. considered a wet location? What is the Type of O.R. and the procedures being performed. I would imagine if a facility is requesting hospital isolation panels and have identified it as a wet location it would be best to get a dual voltage with a 208V secondary in addition to the 120V to allow for 208V laser connection.