USE-2 can not enter a building, correct but dual rated can? What about THHN?
I'm running feed from a 200amp meter base to a 200 house panel, unless I'm over thinking this 3/0 copper USE-2/RHW and #4 ground?
This will all be ran in sch 80.
Sent from my SM-N960U using Tapatalk
I'm running feed from a 200amp meter base to a 200 house panel, unless I'm over thinking this 3/0 copper USE-2/RHW and #4 ground?
This will all be ran in sch 80.