The POCO is requesting we provide a Meter Loop One‐Line Diagram one each for temp & permanent service. I get the permanent service but the temp service isnt on drawings. Has anyone ever had to submit oneline for temp service. Is it the basic meter loop and service with panels and pole? Do i include the size temp service? is the size temp service be determined by GC? my first time being asked for oneline on temp power.