Any requirements/suggestions/rule of thumb for the capacity of a fuel tank for a stand-by generator (200kW), serving a out-patient clinic?
Two levels, two ATS, everything backed up by the generator.
Calculated Peak Demand Load ~250A.
Two levels, two ATS, everything backed up by the generator.