680.24

Status
Not open for further replies.

blueheels2

Senior Member
Location
Raleigh, NC
Occupation
Electrical contractor
So I have a pool I’m wiring that has 5 wet niche luminaries. They are each routed back to the equipment pad in 1” conduits for a total of 5. These are kind of a mistake in the way they were run. This was installed when I was on vacation by the pool guy so they could go ahead and backfill everything. Seems like the correct way would’ve been to terminate them all in a deck box in the pool deck. Probably could dig them up near the pad and do that but that requires me going backwards. Anyone know of an above ground pool rated box with 6 entries or do I use 3 pool rated j- boxes to meet the 680.24 requirements.
 
Status
Not open for further replies.
Top