Hello Everyone:
I was told that I cannot run electrical conduits (branch circuits or feeders) thru the fire pump room to serve other equipment not related to fire pump room equipment. The person reference NFPA 20 which I wasn't able to find any language to prohibit that. The installation is we are stubbing up a bunch of conduits at one of the fire pump wall and transition up to second level to feed some electrical panels.
Any thoughts?
I was told that I cannot run electrical conduits (branch circuits or feeders) thru the fire pump room to serve other equipment not related to fire pump room equipment. The person reference NFPA 20 which I wasn't able to find any language to prohibit that. The installation is we are stubbing up a bunch of conduits at one of the fire pump wall and transition up to second level to feed some electrical panels.