Hey guys,
We are doing a project where the final interconnection of the PV system is at the secondary of the existing transformer at the site (that also supplies the building). We asked the POCO for their guidelines for this interconnection (either to penetrate the t/f from the side or to go underground, etc) because the transformer is owned by them, but they said "Ask your Electrician". We are in talks with the couple of people, but did anyone here do such interconnection previously? if so how did you go about it?
Ps. This T/F is located just outside the building above ground and installed on a PAD (Check attached)
We are doing a project where the final interconnection of the PV system is at the secondary of the existing transformer at the site (that also supplies the building). We asked the POCO for their guidelines for this interconnection (either to penetrate the t/f from the side or to go underground, etc) because the transformer is owned by them, but they said "Ask your Electrician". We are in talks with the couple of people, but did anyone here do such interconnection previously? if so how did you go about it?
Ps. This T/F is located just outside the building above ground and installed on a PAD (Check attached)