- Location
- Bremerton, Washington
The 2008 NEC has the changes in gray text boxes, they jump right off the pages at you. It makes the gray areas very clear! But from an instructors point it will make it easy for the student to follow allong
I've already found my first 2011 NEC change.
Next weekend I post the changes for the Anchorage IAEI meeting that generated the most comments. Ryan Jackson took a lot of heat for his proposal that conduit longer than 18" between two enclosures or boxes has to be supported, but that wasn't his intent in the proposal.
One change I wasn't aware of is an 702 generator with ATS will have to be able to automatically load shed or pick up the entire load.
I've already found my first 2011 NEC change.
Next weekend I post the changes for the Anchorage IAEI meeting that generated the most comments. Ryan Jackson took a lot of heat for his proposal that conduit longer than 18" between two enclosures or boxes has to be supported, but that wasn't his intent in the proposal.
One change I wasn't aware of is an 702 generator with ATS will have to be able to automatically load shed or pick up the entire load.