Looking for a solution for outside lighting attached to an aircraft hanger. The building has a six unit meter pack with disconnects feeding panels in rented units of the aircraft hanger. The problem, by design the outside lighting is being fed from one of the hanger units. Now they want to have a separate meter for the lighting that would require the seventh service disconnect?..not good but possible.
Keep in mind that the land around the building is covered with asphalt and overhead conductors would be out of the question around an airport. Thought about putting a main ahead of the meter pack but it is rated as service equipment only (no way to split N and G) also the poco said no to having a disconnect ahead of the meters.
Any suggestions?
Keep in mind that the land around the building is covered with asphalt and overhead conductors would be out of the question around an airport. Thought about putting a main ahead of the meter pack but it is rated as service equipment only (no way to split N and G) also the poco said no to having a disconnect ahead of the meters.
Any suggestions?