400 AMP SERVICE METER WITH TWIN 200-AMP MB'S FEEDING TWO SEPARATE ML 200-AMP PANELS. QUESTION IS CORRECT GROUND AND BONDING, i SEE THIS AS THE PANELS BEING SUBS AND REQUIRING #6 EQUIPMENT GROUNDS BONDED TO THE CABINETS AND TWO GROUND RODS WITH 1/0 GROUND WIRE. WELL WATER. PLEASE ADVISE AS I HAVE GOTTEN CONFLICTING ANSWERS.