D dunk New member Location San Jose, CA Jun 6, 2009 #1 I'm recommending a service panel upgrade to a solar PV customer. A competitor is saying it would be cheaper to just connect the system on the line side instead of the load side. Would that be safe?
I'm recommending a service panel upgrade to a solar PV customer. A competitor is saying it would be cheaper to just connect the system on the line side instead of the load side. Would that be safe?
iwire Moderator Staff member Location Massachusetts Jun 6, 2009 #2 I think your customer beat you to posting about this. Sure it can be done within the code and safely.
I think your customer beat you to posting about this. Sure it can be done within the code and safely.
iwire Moderator Staff member Location Massachusetts Jun 6, 2009 #3 By the way, what year NEC are you under?