From secondary of utility xfmr, we tap off (2) disconnects, each disconnect will then feed two different buildings:
1. Does above two disconnect need to follow rule of table 450.3(B) note 2?
2. Do we require to bond grounding system of two buildings together?
Thanks!
1. Does above two disconnect need to follow rule of table 450.3(B) note 2?
2. Do we require to bond grounding system of two buildings together?
Thanks!