Not so much a code issue, but a system integrity issue.In the Annexes (back of the code book) there are recommendations, but not code. For 277/480 I would think about a red mud cap, in addition to a scare tape above the first lift (backfilled and compacted 12"), might want to put in scare tape a foot below grade over pipes that are not capped with concrete.
Just a thought, as a person never knows what the ground maybe torn up for whatever reason...