You need to get a meeting set up with the serving electric utility to see what their requirements are for this installation. Is this 1? or 3?, is this hot or cold sequence, and is this fed overhead or underground? Does the electric utility have large enough service conductors?To upgrade an existing building from 200 amp to 400 amp. with two meter sockets, seeing i have never seen one, my question is, is there one set of lugs for the line side or utility side that feeds both meter sockets and two sets of lugs on the load side, one for each meter?