Another meter, I don't see any meters???
.............Are those disconnects or meter sockets?
the third one goes down the drain spout for heat tape.where do the other masts go. I see 3 weather heads and only 2 pipes coming down.
Are those disconnects or meter sockets?
the third one goes down the drain spout for heat tape.
a little more info would be nice.. 4 risers 2 cans ?
how is that emt coming out the side of the socket... looks a little funny
what size are the service conductors in the 3/4 emt ??
I'll bet you start fresh, new riser, guyed independently, new meter enclosure and don't touch the existing. Tough part is getting around that rain gutter.
As far as violations I don't see a ground wire, and the POCO wire seem to travel over the flat roof for quite a distance without proper clearence. Set a new pole.
I don't see a ground wire either. But I also don't see what would have been considered the "service" at the time this was installed.
I don't see a ground wire either. But I also don't see what would have been considered the "service" at the time this was installed.
the third one goes down the drain spout for heat tape.
It looks like the others go inside the building. the 3/4 is for the metering
What is heat tape? Never heard of it.
boy I don't see anything wrong.:-?