Article 518.4 (C) states that you can use pvc and ent in an assembly occupancy as long as it is in a wall that has a 15-minute finish rating. What constitutes a 15 minute finish rating? The walls are 1-hour fire rated. As I recall from years ago, you could not install pvc above the slab. When was this change made in the NEC?