It is my understanding that if you are installing circuits that were sized per the Article 220 load calculations, that you don't have to be too concerned about it, however for industrial and other such occupancies where there are large loads and the circuits are sized based on actual loads, it is an issue. Failure to derate in these cases may result in a failure of the duct bank.