I am currently designing the routing of 120v feeds to fire smoke dampers in a large private residence. The engineer of record has insisted that these be installed in rigid galvanized conduit. I know in the past in school and hospital projects that EMT and MC cable was used, and passed inspection. Is this a new fire code question, or a whim of the engineer?