Is everyone calling 811 when driving ground rods, or do you think, you really know where the utilities are located?
They don't mark privately owned utilities anyway.
Is everyone calling 811 when driving ground rods, or do you think, you really know where the utilities are located?
You are suppose to pound a ground rod in, not dig a hole for it.![]()
Yes they do, and we had one of our local long time contractors, hit a gas line with a rod and the house was to the ground in minutes, lucky the lady just left with her baby to go shopping.Yep. And I've seen them 'pounded' right through water & gas lines, as well as electrical. Not a pretty sight.
If you call in the morning let's say, how long before they show up?
"Whaddya mean, it's not grounded?!"Y... I've seen them 'pounded' right through ... electrical.
I believe there's a 72-hour maximum.If you call in the morning let's say, how long before they show up?
In Ohio, the responsible person/party must call between 10 days to 48 hours before digging... as a matter of law.If you call in the morning let's say, how long before they show up?
If you call in the morning let's say, how long before they show up?