A facility has some serious electrical problems due to a very corrisive atmosphere, poor installations, and unqualifed maintance persons. The metallic enclosures ard badly deteoriated. In equipment ground has been used as the neutral also. Presently doing a upgrade. The EC wants to run a ground throughout the building in a PVC conduit branching off to different pieces of equipment while using the EGC for the neutral. Will start off with a large wire size, splice and drop off at various locations. I told him I did not believe this is to code. I have not found in the code where this is permitted. What do you guys think. If it is permitted please give code reference.