hardworkingstiff
Senior Member
- Location
 - Wilmington, NC
 
Is it permissible to install rigid conduit (1/2") on top of a concrete floor adjacent to the cable guard in a commercial garage between two post of a 2-post above ground lift?  (In other words the vehicle will run over the conduit every time it drives on/off the lift area.)
	
		
			
		
		
	
				
			
				