Folks - I'm bringing in a new medium voltage underground service into a basement switchgear with metering.  The service point is out on a pole, and the conductors for the service lateral are customer owned.  I understand what 230.6 states in order to know how those conductors are to be considered outside a building, but where in the Code does it state that the service conductors need to be outside the building?:-?
	
		
			
		
		
	
				
			
				