I am designing a project that in the sub main electrical room (below grade) I have a 800 amp drip loop section from that section I have approximately 10ft to the Main Switch / Meter section. Is it to code to run the un-fused service feeders in GRC conduit(s) within the electrical room to the Main Switch?