J James Hamilton New member Feb 1, 2011 #1 I have a 2 pull breaker installed it is feeding 2 different pieces of equipment in different locations in a bulding.. I was wondering if this is correct according to the code book.
I have a 2 pull breaker installed it is feeding 2 different pieces of equipment in different locations in a bulding.. I was wondering if this is correct according to the code book.
iwire Moderator Staff member Location Massachusetts Feb 1, 2011 #2 That would be a two 'pole' breaker and it may or may not be OK depending on the specifics of the loads and circuits.
That would be a two 'pole' breaker and it may or may not be OK depending on the specifics of the loads and circuits.