TVA subcontractor electrician faces federal charges

Status
Not open for further replies.
If I have heard correctly, that plant was already built just never commissioned, now that it has been sitting for so long, they are having to pull out everything and start over. I hear the Union is having a hard time finding enough people to work on this project.
 
What a scumbag! Hope he goes to prison for the whole 25 years.
http://www.houmatoday.com/article/20110324/APN/1103241427?p=1&tc=pg

The real scumbags stay out of sight.
He might be a fall guy for the higher-ups and the NRC may advance "the commercial or special interests that dominate the industry or sector it is charged with regulating."
http://en.wikipedia.org/wiki/Regulatory_capture

Lying can accomplish almost anything in the short term, and "it's easy to tell a lie but it's hard to tell just one."
 
The real scumbags stay out of sight.
He might be a fall guy for the higher-ups and the NRC may advance "the commercial or special interests that dominate the industry or sector it is charged with regulating."
http://en.wikipedia.org/wiki/Regulatory_capture

Lying can accomplish almost anything in the short term, and "it's easy to tell a lie but it's hard to tell just one."

Interesting take on it, something to consider for sure.
(Sorry about the double post, froze up the first time I tried)
 
Status
Not open for further replies.
Top