Red Wiggler
Senior Member
Is it permissable to use a NEMA 4x junction box in a Class 2 Div 2 area with the conduit penetraitions terminating in Meyers Hubs? Or will I need to use something different?
Inside the box will be a phone modem and an outlet to power the modem. The box will always remain closed and sealed during operations.
Any thoughts?
Inside the box will be a phone modem and an outlet to power the modem. The box will always remain closed and sealed during operations.
Any thoughts?