Has anyone come across a statement in the NEC or NEC Handbook that gives this limit (it doesn't have to be done if service is 120/240V, 800 amps, and fed by a 150 KVA transformer or less) on a recommended or required activity? I'm not sure what activity though. I thought it was doing an arc flash hazard analysis but the NEC doesn't cover that. Could that have come from NFPA 70E? Maybe it had to do with short circuit calculations but I'm coming up empty looking through the NEC Handbook. Did I dream this?