George Stolz Moderator Staff member Location Windsor, CO NEC: 2017 Occupation Hospital Master Electrician Jun 30, 2011 #21 If you found it on the net, just post the link to the pdf. Otherwise, it's gotta be a pretty small file to load as an attachment.
If you found it on the net, just post the link to the pdf. Otherwise, it's gotta be a pretty small file to load as an attachment.
S stew Senior Member Location federal way,washington Jul 1, 2011 #23 View attachment 1049285 milbank roping requirement.PDF here is a picture of the milbank sticker on thier service bussing
View attachment 1049285 milbank roping requirement.PDF here is a picture of the milbank sticker on thier service bussing
S stew Senior Member Location federal way,washington Jul 1, 2011 #24 Its surprizing how much rope this takes. I didi one once and bought 25 ft of rope thinking it was enough. NOT! had to get a 50 foot piece and bareley made that. had paralell 250 mcm 480 3 phase service. looked cool when I finished though.
Its surprizing how much rope this takes. I didi one once and bought 25 ft of rope thinking it was enough. NOT! had to get a 50 foot piece and bareley made that. had paralell 250 mcm 480 3 phase service. looked cool when I finished though.
C Cow Senior Member Location Eastern Oregon Occupation Electrician Jul 1, 2011 #25 I just did one again today. It seems to take about 40' or so everytime I do it.