Good Morning Friends,  I ran across an installation during an inspection where the EC had installed -3- 2pole definite purpose relays for lighting control. My question is "Does this require a testing labs listing"  Because this is a "field assembled" part does it even require a listing if the box is listed and the relays are listed.  Thanks !  Lyle  
	
		
			
		
		
	
				
			 
				
 
 
		 
 
		