ok here we go one 277/480 volt service with three service switches.
copper detail through two enclosure .
neutral has a gec connected to it.
service switches just connected to all four copper details.
not one service switch is bonded ,
i say all three have to be bonded
how am i doing so far
copper detail through two enclosure .
neutral has a gec connected to it.
service switches just connected to all four copper details.
not one service switch is bonded ,
i say all three have to be bonded
how am i doing so far