Termporary otdoor outlets cites

Status
Not open for further replies.

Open Neutral

Senior Member
Location
Inside the Beltway
Occupation
Engineer
Installing: TEMPORARY UNDERGROUND ELECTRIC SERVICE SINGLE‐PHASE, 036670 120/240 VOLT, 100 AMPS MAXIMUM per PG&E 036670.pdf

My question is about the outlets.

We'll put the whole mess under a roof atop the post, covering both the meter service/breaker panel [Cutler-Hammer EUSERC MBE1224B100BTS] & adjacent outlets.

Where do I go to for the outlet requirements; i.e. boxes/rainhoods/et. al.? What's "outdoors" and not? Assume GFI is required & even if not, I'd use same. [Hard enough to get good help without killing 'em off...]


ps: danged computers....won't let me correct the typing errors in the Subject....gno fare!!!!!
 