Wade Swanson
Member
- Location
- Arvada, Co. USA
I need to put in elevator contacts and delay in an old transfer switch that will not accept the new elevator controlls. Can I do this with a phase/voltage monitor and relays, or do I need something else.
The answer I got was to change the transfer switch
	
		
			
		
		
	
				
			The answer I got was to change the transfer switch
 
				