just went to look at 8 meter/fuse upgrade job. all is going to be smooth except for grounding.
main cold water entry is on other side of concrete slab. ive ran into things like this in the past with different inspector opinions. am i good with 2 ground rods more than 6 ft apart and bonding nearest cold water line or must i be within first 5' of water entry thus breaking up lots of nice walkway and if so what is best metod for running gec through dirt?
 
just went to look at 8 meter/fuse upgrade job. all is going to be smooth except for grounding.
main cold water entry is on other side of concrete slab. ive ran into things like this in the past with different inspector opinions. am i good with 2 ground rods more than 6 ft apart and bonding nearest cold water line or must i be within first 5' of water entry thus breaking up lots of nice walkway and if so what is best metod for running gec through dirt?


Bobby, have patience, do not duplicate your threads.
 
Status
Not open for further replies.
Top