I have a single family residence and the owner would like to add a 50A 120V load to existing service. It will be installed in the form of 3 20A dedicated circuits to a craft room that will have various cord and plug connected loads. Where would I include this type of load in a service calculation to see if the existing service needs upsizing? Thanks