Feeding a 200A rated panel and let's just assume the 80% load capacity (160A). The run is +/-800 feet long. Two questions, what wire size is recommended and is there a requirement for the distance in between for access pull points (christy boxes)?
Two questions, what wire size is recommended and is there a requirement for the distance in between for access pull points (christy boxes)?
Ignoring minor details as asked above. 500 kcmil al at 240v 1ph, and 3/0 al at 480v .
voltage and phase?
Ignoring minor details both are undersized.
240V single phase