cavell219
Member
- Location
- Gary,Indiana Lake County
Hi all, please help me with this one.
I am installing a temporary service for a job, it will be an overhead service coming off of a pole. At the base of the pole I have the meter can and a 200A disconnect about 4 to 6 feet off of the ground. Here is the part I need help with.
I want to run triplex overhead 500 feet strung up by power poles to the temporary trailer with a ground rod at the trailer I will connect to. I thought this had to be quadplex, but the inspector is telling me triplex. This will be the first of many inspections and I do not want to have to redo this temporary.
Any help is greatly appreciated.
I am installing a temporary service for a job, it will be an overhead service coming off of a pole. At the base of the pole I have the meter can and a 200A disconnect about 4 to 6 feet off of the ground. Here is the part I need help with.
I want to run triplex overhead 500 feet strung up by power poles to the temporary trailer with a ground rod at the trailer I will connect to. I thought this had to be quadplex, but the inspector is telling me triplex. This will be the first of many inspections and I do not want to have to redo this temporary.
Any help is greatly appreciated.