Silverado212
New member
- Location
 - Ross,OH USA
 
First residential parallel feed. Existing service is 200A and the home owners are building a rather large addition to existing home. We are adding a second 200A panel in the addition. Will be installing parallel feeders 4/0 alum from pole underground to 320A meter can then to two separate 200A panels. My question is exactly how bonding and grounding will be installed. The existing panel has a GES consisting of GEC to GE (ground rod) and GEC to water pipe? 
Thanks
	
		
			
		
		
	
				
			Thanks
				