meisenb
Member
- Location
- Addison, IL
I have a frost heave prevention heat trace system where heat trace cable is installed under a structure. This cable will be located mostly in an Unclassified Area inside conduit. It will route through a Class 1, Division 1 area and Class 1, Division 2 area. I am being told that heat trace cable that is installed in conduit in a Class 1 Division 1 Area does not have to be rated for Class 1, Division 1. Is this accurate? Per NEC, all utilization equipment in C1,D1 has to be rated for C1, D1. How does adding the conduit on the outside of it give this application an exemption?