I have never installed on a standing seam metal roof. I know where to get the hardware and that each metal panel needs a bonding lug.
Has anyone had to prove wind uplift resistance with the metal roof? I figure the hardware is good at the PV to standing seam attachment but possibly the standing seam roof attachment down to the structure undernieth uplift resistance may not be sufficient for a retrofit pv array's increased uplift load? Anyone run into this before?
Has anyone had to prove wind uplift resistance with the metal roof? I figure the hardware is good at the PV to standing seam attachment but possibly the standing seam roof attachment down to the structure undernieth uplift resistance may not be sufficient for a retrofit pv array's increased uplift load? Anyone run into this before?