doing GRC instead of EMT?
i've got commercial bathrooms, and the spec, believe it or not,
is for GRC for anything not in concrete or masonry walls.
yup, cut and thread. before i totally shoot myself in the foot here,
i'm thinking 3X the labor over EMT. does that sound high or low?
talking 1/2" and 3/4" above a hard lid, new construction.
everything in the slab and block walls will be PVC. everything
else will be cut and thread. so the GRC will mostly be switchlegs
for the lights, and feeds for the exhaust fans, etc.
any thoughts? thanks.....
i've got commercial bathrooms, and the spec, believe it or not,
is for GRC for anything not in concrete or masonry walls.
yup, cut and thread. before i totally shoot myself in the foot here,
i'm thinking 3X the labor over EMT. does that sound high or low?
talking 1/2" and 3/4" above a hard lid, new construction.
everything in the slab and block walls will be PVC. everything
else will be cut and thread. so the GRC will mostly be switchlegs
for the lights, and feeds for the exhaust fans, etc.
any thoughts? thanks.....