I am about to start a fire alarm conduit job and the majority of the devices will be ceiling mounted on an existing suspended (T-bar) ceiling. I want to use an EMT conduit system for this project. Without getting into the requirements of the actual box support, something in the back of my mind is telling me that the conduit between the fixed building structure and the flush boxes in the ceiling shall be flexible. I can't find this requirement anywhere in the code. Am I wrong?? Any ideas?? The job is in Southern California.