When Running 6 duct bank, IN concrete. 400 feet. Is their a requirement for a Underground vault or hand holds.
Example: 1 every 200 feet.
Or a 2 conduit without concrete . Hand hold requirements. Is their a code. Or is this up to engineering.
If its only when spec'ed. ?
Example: 1 every 200 feet.
Or a 2 conduit without concrete . Hand hold requirements. Is their a code. Or is this up to engineering.
If its only when spec'ed. ?