Toros
Senior Member
- Location
 - Tujunga, CA
 
hi,why we bound metal water pipes (primary sys. grounding) as soon as they enter in to the building (within 5 ft)?    How would you ground the system if there was no metal water pipe into the building??????                                    I am still not stuck there....    thank you
	
		
			
		
		
	
				
			
				