When is it required in the NEC to install an expansion couping on a horizontal run of Schd #40 PVC conduit ? In other words what is the MIN length that it is required ? Also how about under a mobile /manufactured home where the conduit is used as feeder to the home?
	
		
			
		
		
	
				
			
				