I attached a pdf of the scenario i have questions on, please take a quick look at it.
1) Can a service feed be taped without over current protection ahead of the taps as shown in the attached pdf?
2) If the answer is yes, what would be minimum required size for each of the conductors shown in the attached pdf?
1) Can a service feed be taped without over current protection ahead of the taps as shown in the attached pdf?
2) If the answer is yes, what would be minimum required size for each of the conductors shown in the attached pdf?