Ok helping out with a temp power design. They give all the loads with amps and voltage With the quantity of each such as welding hook ups, pumps, hoists etc.
There are about 100 individual loads listed. It is a 30 story building. I Believe a main switchboard is needed than lighting and appliance panelboards on every floor. Maybe a few distribution boards to feed the panelboards or should they come right from the main switchboard. Transformers will also be needed. Where would disconnects be required?
How would one start to approach sizing the main switchboard and the sub panels? Get the total connected load or total calculated load? I imagine that would be for the main switchboard as everything will be feed from there. The panelboards would be sized according to what loads its feeding on that floor. Thanks a lot!!!
There are about 100 individual loads listed. It is a 30 story building. I Believe a main switchboard is needed than lighting and appliance panelboards on every floor. Maybe a few distribution boards to feed the panelboards or should they come right from the main switchboard. Transformers will also be needed. Where would disconnects be required?
How would one start to approach sizing the main switchboard and the sub panels? Get the total connected load or total calculated load? I imagine that would be for the main switchboard as everything will be feed from there. The panelboards would be sized according to what loads its feeding on that floor. Thanks a lot!!!