Our company is installing a 3.57kw system using Solar Edge inverter/optimizers which complies with the Rapid Shutdown requirement. On the roof is an existing system with an SMA inverter.
Although our company commits to installing code-compliant systems, the existing systems falls within the old code... my concern is that due to customer restrictions, we will be accumulating the systems so that we can use (1) AC DISCONNECT. The AC Disco will act as the RAPID SHUTDOWN for the Solar Edge system but not for the SMA system.
Given that we will not be adding a birdhouse/relay with the SMA - what labeling is required in this situation?
Thanks for your help. This forum is a great educational resource!
Best,
Andrew
Our company is installing a 3.57kw system using Solar Edge inverter/optimizers which complies with the Rapid Shutdown requirement. On the roof is an existing system with an SMA inverter.
Although our company commits to installing code-compliant systems, the existing systems falls within the old code... my concern is that due to customer restrictions, we will be accumulating the systems so that we can use (1) AC DISCONNECT. The AC Disco will act as the RAPID SHUTDOWN for the Solar Edge system but not for the SMA system.
Given that we will not be adding a birdhouse/relay with the SMA - what labeling is required in this situation?
Thanks for your help. This forum is a great educational resource!
Best,
Andrew