For large office buildings, is it standard practice to calculate the load for the entire building to determine if a new load will require an upgrade of any of the upstream panelboards, feeders, and breakers? If not, then how far back should the load be calculated for a new sub-panel and what would trigger the need to calculate the load all the way back to the service entrance?