All,
I have a 6 kW 240 Volt submersible electric heater that goes in a underground storage tank. I am protecting the unit by a 30 Amp 3 Pole GFCIE only circuit breaker. My question is I have a combination motor starter to be used for the unit. Can I leave the overload section in place or should I just leave the contactor.
Thanks in advance.:roll:
	
		
			
		
		
	
				
			I have a 6 kW 240 Volt submersible electric heater that goes in a underground storage tank. I am protecting the unit by a 30 Amp 3 Pole GFCIE only circuit breaker. My question is I have a combination motor starter to be used for the unit. Can I leave the overload section in place or should I just leave the contactor.